Walls are going up in the preschool area. This is the main hallway that wraps around the preschool chapel.
The concrete floors have been poured in the food service and dining areas. Windows should be going in soon.
This is the elementary section. They are continuing work on sprinkler systems and heating ducts.
This is the mall – the main hallway that runs through the new building connecting the nurseries, elementary, preschool, bookstore and food service areas.
Roofs continue to be installed on the new building in preparation for winter.
